§ 18-46. Enforcement generally.  


Latest version.
  • (a)

    The village engineer shall be responsible for fulfilling all of the duties listed in section 18-47.

    (b)

    To fulfill those duties, the village engineer first should use the criteria listed in section 18-21, to determine whether the development site is located within a floodplain. Once it has been determined that a site is located within a floodplain, the village engineer must determine whether the development site is within a flood fringe, a regulatory floodway, or within a SFHA or floodplain on which no floodway has been identified. If the site is within a flood fringe, the village engineer shall require that the minimum requirements of division 3 of this article are met. If the site is within a floodway, the village engineer shall require that the minimum requirements of division 4 of this article are met. If the site is located within a SFHA or floodplain for which no detailed study has been completed and approved, the village engineer shall require that the minimum requirements of division 5 of this article are met.

    (c)

    In addition, the general requirements of division 4 of this article shall be met for all developments meeting the requirements of divisions 3, 4 and 5 of this article. The village engineer shall ensure that all subdivision proposals shall meet the requirements of section 18-50.

    (d)

    If a variance is to be granted for a proposal, the village engineer shall review the requirements of section 18-48 to make sure they are met. In addition, the village engineer shall complete all notification requirements.

    (e)

    In order to ensure that property owners obtain permits as required in this article, the village engineer may take any and all actions as outlined in section 18-49.

(Code 1997, § 34-31; Ord. No. 91-11-17, § 400.0, 11-5-1991; Ord. No. 08-06-13, § 1(34-31), 6-17-2008)